Now that we are in the thick of actually building, there doesn’t seem to be much time to do the posts! So, for a picture overview of progress, here are links to different folders that progressively bring us up to early August. Enjoy!

  1. Digging the foundation – high lift and Bobcat – early June
  2. Building material – the wheat field near I-64 where we will probably get some of our straw bales – late June
  3. Annex footers – the lowest part of the foundation, which is on solid rock for the annex – mid July
  4. Main footers – includes video of the giant concrete pump truck – mid July
  5. Annex foundation walls – formed and poured on the footers – mid July
  6. Main foundation walls – formed and poured the same day, but footers buried in dirt this time – mid July
  7. Legal immigrant from CA – and a great volunteer, I might add 🙂 – mid July
  8. Back filling and the rocks – the Bobcat in action, both filling in against the annex foundation AND carefully setting aside Beth’s rocks 😉 – mid July
  9. Guest shelter – will have a roof, sides, a table and chairs, lighting at night, cool drinks, snacks, etc. — for the volunteers who work with straw & plaster – to rest their bones now and then… – July thru Sept.
  10. A beautiful driveway – it’s a little steep at the crossing, but the trees along the way are so wonderful – July
  11. Building stuff – here’s all the kinds of things which go into a house – late July
  12. Main house floor – the foundation finally gets a floor on it! – early August
  13. First floor framing – the post and beam frame goes up (except for the utility and master bath, which are stick framed) – early August
  14. Main 2nd floor – TGI, beams and subfloor, plus some amazing views of the trees all around – early August
  15. Main 2nd walls – most of the walls are up on the 2nd, and getting ready for the roof rafters – early August
  16. Main porches, shaping up – giant posts and beams make the back veranda outside the master bedroom look amazing, plus the 2nd ceiling rafters are in place – early August
 Posted by at 9:51 pm  Tagged with:
Jul 042019
 

In the last few days we have been buying lots of #3 rock, plus something called “crusher run” by the dump truck load. Because of the rain, it has been going on the road and … sinking :-O Obviously, this is not a plan, except that we’re 6 weeks behind schedule, so it’s … the plan. As you can see from the photos, we have a very rocky driveway right now. At least, it works, and it will have to work in the near future because massively heavy CONCRETE trucks will show up soon, and there will be no giant helicopters to fly the concrete to the foundation forms. It has to be carried by the mixer trucks and poured in through a chute.

Jun 122019
 

In previous posts I described the process (and hassle) of cleaning out the pipes which the crossing is built on. Since doing that, the pictures nearby represent the highest the creek has gotten since then. In point of fact, in spite of all the rain, the crossing itself has never been covered. PTL! Hopefully, this record will continue as we build the house … unless we really get some rain.