Apr 162019
 

After roughly 10 tries last week, we found an excavator with a claw (the grabber thing above the bucket in the picture). It got the crossing cleaned out! Since then, the creek has been happy, and we’re moving forward… Notice the large rocks in the picture of the crossing. Some of them are too big for 2 men to lift! Hopefully, the creek will go around them now and will stay off the far edges of the concrete. We will eventually need to modify the intake pipes so less debris will be caught in them, and more will flow over the top. In the meantime, you-know-who (aka, the builder – aka, not the builder’s wife) will be getting down in the creek and cleaning out debris by hand so as to avoid renting another Bobcat.

Mar 212019
 

…with a backhoe attached to it. That’s because the creek keeps cutting the ends of our crossing out every time the water gets high, and before we can fix it we need the culverts cleared of debris. See? We think a claw on a backhoe for an hour or so will get all the logs & stumps picked up and dumped on the other side, where the creek itself will wash them away. Here are the stumps and things that need to be moved.  Know anyone with a claw on the end of a backhoe? If so, leave a comment on this post… thanks!